I am about 3/4 done with the baseboard and shoe, there is the ceiling to be framed in bed moulding, the octagonal window and two doors need casing. Then the two doors need refinishing. But it's a long way from two weeks ago. (see https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhx3oh4f2LQ2bOk9BL_o6N4KrvTf-d27lNhinfSLSyNC1OsYLrrv-YAv5j6UJ0UVS9gx3vioROn4yOtlpDtUxiMIUi5OTTA-C4hgoxoxOrk8B2mEhXxKZwoSmYk8JV3Okcuw4iRj8dslk4O/s1600-h/finn's+bedroom+floor+001.jpg), for example).
I had to modify the closet door. I made the rough opening just a tad too small or got the wrong size door - take your pick. I trimmed 1 3/8 inches from the height and 5/8 from the width, then re-drilled the pivot holes to make them deeper, and last painted the sawn edges to match.