Sunday, April 12, 2009

Finishing the Dining Room





Another one for Laura

Happy Easter

Steve and Cara watching baseball.
Pane di Pasqua ready for the oven.

Sunday, April 5, 2009

A Little Like Lego

We decided to do something different in the DR with the floor - click-and-lock laminate. It's still bamboo, and even harder than than the existing stuff.

Here I've cut a straighter edge on the existing floor in the LR.


The first three courses are in place. It took a little struggling because they don't snap together tightly and irrevocably, so I put down some braces to push against. Once we got three rows down, it became easier.

By this time, even with not a single nail, the floor feels very solid and unmovable.


Here I show off some of the trickier cuts we had to do, first around the heating duct, then around the stairs.

Framing Of a Different Sort

A bit of review: Here was the planned color scheme for the DR:


Here is Jennifer painting in the frames. Open up the picture to see the chalk lines on the wall. She used a long straightedge to help with the edges of the boxes.





Next weekend: trim goes in.

Tuesday, March 31, 2009

For the Wealth Of a Nail

If my coworkers wonder why I come in looking like what the cat dragged in, here's an example.


The washer would not drain last Sunday. Reading the owner's manual, I learned that the solution was to open the drain on the bottom, let the water go out (it's near the sump, no biggie) and clear whatever was in the little filter there.

I did not find anything so after several attempts at that I gave up for the day. Last night, I opened the back and checked all drain hoses and returned them. Still no good. I made dinner and thought about it awhile.

This morning I got the courage to pull the pump and drain/filter piece out, pull the pump out and inspect the impeller. Lo and behold, a small finish nail had jammed the impeller. I removed it, jury-rigged a power source to the pump, checked that it still worked, and it's almost all back in. All before 6:45 a.m. (I also made three gallons of iced tea, washed the dishes, fed the animals, and made a hot tea for Jennifer, if I may brag.)

By tonight it should be operable again.

It reminds me of the story "For the Want Of a Nail," except this time I had one and it was all the woe.

Time washer was inoperable: three days.
Time spent working on washer: two hours, cumulative.
Money saved: probably about $200 or more.
The joy of rolling around a wet basement floor this morning & the satisfaction of knowing I did it myself: yeah, that.

Sunday, March 29, 2009

The Finished Look


Notice the 'medallion' around the light. Flooring and trim next week.